Miller Creek Wastewater Plant

In July 2002 the Miller Creek Plant in Burien, WA needed to replace deteriorating components in the headworks of the plant. This entailed the installation of new stainless step screens, the replacement of the grit collection system, the repair of the primary distribution box and the addition of air blower capacity to the system. Because the Miller Creek collection system is very long, the residence time of the wastewater in the pipes causes it to become septic, therefore subjecting the headworks to severe hydrogen sulfide attack.

The Miller Creek headworks components had suffered from this exposure. The 20-year old screens had to be replaced, the grit chamber exhibited failing concrete structures and rusted mechanicals, and the concrete primary distribution box had also corroded heavily. Because the headworks could not be taken completely out of service for the project and would have to be shut down in phases, the engineering firm desired a coating system with both a short cure time and chemical resistance. In addition to meeting these two criteria, Tnemec’s Series 434 Perma-Shield H2S was chosen because it would allow the contractor to trowel apply the product and reform the surface.

The concrete was power washed and abrasive blasted to remove the deteriorated concrete down to the reinforcement in some areas. Series 218 MortarClad, an epoxy modified cementitious resurfacer, was then used to repair the concrete and build up the existing surface. Next, Series 434, a modified polyamine epoxy mortar, was applied at 125 mils by trowel. According to Garri Garrison, the project manager for the painting contractor, “the epoxy mortar offers hardness and very good adhesion.” Garrison has since used the system in many additional projects.

The successful application of the high-build, chemical-resistant epoxy mortar to the splitter chamber boxes was followed by the system’s use throughout the vortex grit setting chamber as well. Since the project completed, the engineering firm has visually inspected the coatings. According to Evan Henke, project manager for the engineering firm, there is no sign of coating degradation and the plant workers have reported no flaking or discoloration of the system.

    Project Information

    Location
    Burien, Washington

    Completion
    February 2003

    Owner
    Southwest Suburban Sewer District

    Engineer
    CHS Engineers, Inc. Bellevue, Washington

    Applicator
    TEK Construction, Inc. Ferndale, Washington

    Applicator
    Hunnicutt's Inc., Bellingham & Bothell, WA

    Printer Friendly Version

    PP_Miller_Creek_Plant_Profile

    Contact Your Rep

    Looking for Some Local Coatings Guidance?

    Reach out to one of our knowledgable and reliable representatives near you.

    How to Purchase

    Ready to Order Tnemec?

    We're ready to help. Click below to learn more about our purchasing process.

    Color Requests

    Searching for the Right Color?

    Use our color tool or request more tools from your local representative.

    Continue Exploring in the color tool

    Close

    Color Swatch packet

    When you finish selecting, request your Swatch Packet below. Expect your swatch cards in 5-7 business days. Contact your expert Sales Rep at any time.

    Sorry, there is a maximum of 6 color swatches.

    Request swatch packet

    Continue Exploring in the color tool

    Close