Georgia Dome

When the largest cable-supported domed football stadium in the world required a new color scheme for its exterior, the project called for a well-executed game plan by the project management company, the architect, general contractor and a team of coating professionals.

Coating the exterior of the Georgia Dome presented a challenge given the stadium’s close proximity to moving traffic, nearby parking and office buildings. In order to avoid damage from overspray, all coatings had to be applied by roller. The exterior skin of the dome consists of architectural concrete masonry units (CMUs) to a height of 12 feet, flat metal panels up to the low roof level at 97 feet and corrugated panels from the lower roof to the compression ring 55 feet above. The embossed metal had a textured galvanized surface originally finished with a Polyvinylidene Fluoride (PVDF) coil-coating. Working from 40-foot-wide stages, coating crews prepared both coated and uncoated substrates by washing them with a pre-paint cleaning chemical at a pressure of 3,000 psi and a temperature of 180 degrees F.

Metal panels were primed with Series 66 Hi-Build Epoxoline, a polyamide epoxy primer, followed by a topcoat of Series 1071 Fluoronar, a high-solids fluoropolymer polyurethane. A single coat of Fluoronar was specified, except on red panels where two coats were applied. Concrete surfaces received two coats of Series 156 Enviro-Crete, a breathable waterborne acrylate.

An ultra-durable finish, Fluoronar was chosen for its user-friendly application characteristics, outstanding color and gloss retention, and strong adhesion to aged coil-applied coatings. “We experienced no problems with this product even when a thunderstorm appeared and rained on a freshly coated surface. It was easy to apply, which saved us a lot of headaches,” recalled Charles Wagner, project estimator with Specialty Finishes, Inc., the project’s coating contractor.

Jeff Wierenga, AIA, project architect with the firm of Thompson, Ventulett, Stainback and Associates (TVS) acknowledged, “It was a very smooth-running operation from all sides and we were really pleased with how it turned out.”

    Project Information

    Location
    Atlanta, Georgia

    Completion
    July 2008

    Owner
    Georgia World Congress Center Authority

    Project Management
    Darden & Company

    General Contractor
    Holder Construction

    Architect
    Thompson, Ventulett, Stainback and Associates

    Cooling Applicator
    Specialty Finishes, Inc.

    Printer Friendly Version

    PP_Georgia_Dome_Profile

    Contact Your Rep

    Looking for Some Local Coatings Guidance?

    Reach out to one of our knowledgable and reliable representatives near you.

    How to Purchase

    Ready to Order Tnemec?

    We're ready to help. Click below to learn more about our purchasing process.

    Sustainable Building

    Need Coatings for LEED Projects?

    Tnemec offers a long list of low VOC coatings built to protect sustainable structures.

    Continue Exploring in the color tool

    Close

    Color Swatch packet

    When you finish selecting, request your Swatch Packet below. Expect your swatch cards in 5-7 business days. Contact your expert Sales Rep at any time.

    Sorry, there is a maximum of 6 color swatches.

    Request swatch packet

    Continue Exploring in the color tool

    Close