Brush Creek Sewer Pipe Replacement

On a typical day, the aerial crossing over Kansas City’s Brush Creek channels millions of gallons of wastewater through a 72-inch sewer line, which is protected against microbiologically influenced corrosion (MIC) by a 100 percent solids ceramic epoxy lining from Tnemec.

“Kansas City, Missouri, Water Services Department has standardized on Series 431 Perma-Shield PL for steel and ductile pipe used in severe sewer exposures,” explained Scott Keilbey of Midwest Coating Consultants, Inc. “For the aerial crossing over Brush Creek, Series 431 was used on the inside and outside of the steel pipe segment measuring 450 linear feet.”

The pipe replaced a nearly 100-year-old concrete sewer main that collapsed last summer due to erosion along Brush Creek. The overall project included the addition of a rock box to catch debris, added stabilization to prevent future erosion of the creek’s embankment, the installation of new piers and construction of two new junction structures.

“The project attracted interest from various steel pipe suppliers and their applicators who made alternative suggestions for polyurethane coatings to be used,” Keilbey recalled. “Kansas City Water Services and the design engineer, Burns & McConnell, stayed with their specification for Series 431 based on their prior experience with the product.”

Series 431 is formulated to resist elevated levels of sewer gases, which can rapidly corrode pipes used in severe wastewater environments. The coating was shop-applied at 40 mils dry film thickness (DFT) by the pipe supplier, Northwest Pipe Company, using plural component (PC) spray equipment.

“Local contractor, Leath & Sons, erected the pipe, welded it together and repaired the weld seams,” Keilbey shared. “The aerial crossing is visible from the Swope Parkway, so they decided to apply a polyurethane finish coat to the pipe’s exterior to enhance its appearance.”

The pipe exterior received a shop-applied finish of Series 1074U Endura-Shield II, an acrylic polyurethane finish coating containing a blend of ultraviolet light (UV) absorbers for enhanced color and gloss retention.

The Brush Creek watershed is dominated by single-family residential developments and commercial districts, including the Country Club Plaza, which is Kansas City’s premier retail and entertainment destination.

    Project Information

    Location
    Kansas City, Missouri

    Completion
    December 2016

    Owner
    Kansas City Water Services

    Engineer
    Burns & McDonnell, Kansas City, Missouri

    Shop Applicator
    Northwest Pipe Company, St. Louis, Missouri

    Printer Friendly Version

    PP_Brush_Creek_Pipe_Profile

    Contact Your Rep

    Looking for Some Local Coatings Guidance?

    Reach out to one of our knowledgable and reliable representatives near you.

    How to Purchase

    Ready to Order Tnemec?

    We're ready to help. Click below to learn more about our purchasing process.

    Color Requests

    Searching for the Right Color?

    Use our color tool or request more tools from your local representative.

    Continue Exploring in the color tool

    Close

    Color Swatch packet

    When you finish selecting, request your Swatch Packet below. Expect your swatch cards in 5-7 business days. Contact your expert Sales Rep at any time.

    Sorry, there is a maximum of 6 color swatches.

    Request swatch packet

    Continue Exploring in the color tool

    Close